Maintenance and care
multi N/C 2100S (duo, pharma)
66
Measuring gas drying and cleaning
Maintenance interval
Maintenance task
Daily
¡
Check the filling of the halogen trap.
¡
When half of the copper wool or the brass wool is discol-
ored, replace the filling.
Quarterly
¡
Check the TIC condensate container and the condensation
coil for cracks and damage.
Every 6 months
¡
Replace the water traps on the front and on the gas box.
Every 12 months
¡
Clean the TIC condensate container and the condensation
coil (or earlier if necessary).
Integrated Double Furnace solids module
Maintenance interval
Maintenance task
Quarterly
¡
Check the combustion tube for cracks and damage.
¡
Check the furnace lock for leaks.
Every 12 months
¡
Clean the combustion tube (earlier if required)
When necessary
¡
After software notification at the latest: Check the catalyst.
Replace as necessary.
¡
Replace a worn sealing ring of the lock.
Chemiluminescence detector (CLD)
Maintenance interval
Maintenance task
Every 12 months
¡
Replace the adsorber cartridge.
6.2
Adjustment and setting
6.2.1
Adjusting the autosampler
An adjustment of the autosampler is necessary:
¡
Before the first start
¡
After every syringe replacement
¡
After every manipulation of the locks (e.g., catalyst change and maintenance work)
¡
During recommissioning after transport or storage
During adjustment, you must adjust the canula to the following positions:
¡
Position 1 on the sample tray
¡
TC lock, septum-free: Entrance of the combustion furnace
¡
TIC lock with septum: Entrance of the TIC reactor (not for multi N/C 2100S pharma)
Always check and adjust all positions.
X- and Y-axis coordinates
Adjust the positions as precisely as possible in the x- and y-axis directions. The canula
must dip into the middle of the sample vessel at position 1.
The following values serve as orientation points:
Position 1
Furnace
TIC reactor
X-axis direction
5
90
1010
Y-axis direction
1435
475
80