2-22
Server Installation and Start Up
For use with Pentium II Xeon and Pentium III Xeon processor-based servers only
Writer: Sam Ogden Project: Compaq ProLiant 6000 Setup and Installation Guide Comments: 312237-003 (February 1999)
File Name: C-CH02.DOC Last Saved On: 2/4/99 1:18 PM
COMPAQ CONFIDENTIAL - NEED TO KNOW REQUIRED
Inserting Cage Nuts in the Rack Frame
The cage nuts fit on the inside of the rails at the marked locations.
1.
Squeeze the cage nut with your fingers
1
to pry the cage nut into
position
2
.
2
1
1
Figure 2-13. Inserting cage nuts
2.
Repeat for each cage nut.