2-18
Server Installation and Start Up
For use with Pentium II Xeon and Pentium III Xeon processor-based servers only
Writer: Sam Ogden Project: Compaq ProLiant 6000 Setup and Installation Guide Comments: 312237-003 (February 1999)
File Name: C-CH02.DOC Last Saved On: 2/4/99 1:18 PM
COMPAQ CONFIDENTIAL - NEED TO KNOW REQUIRED
Installing the Rack Lift Assists
To install the rack lift assists:
1.
Align the two rack lift assists with the right side of the chassis and
secure each with two 6-32 self-threading screws.
Figure 2-9. Installing the rack lift assists on the right side of the chassis
2.
Repeat on the left side.