2-21
Compaq ProLiant 6000 Setup and Installation Guide
For use with Pentium II Xeon and Pentium III Xeon processor-based servers only
Writer: Sam Ogden Project: Compaq ProLiant 6000 Setup and Installation Guide Comments: 312237-003 (February 1999)
File Name: C-CH02.DOC Last Saved On: 2/4/99 1:18 PM
COMPAQ CONFIDENTIAL - NEED TO KNOW REQUIRED
Marking the Rack with the Template
Use the paper template provided to mark the rack for cage nut and mounting
bracket positions. Starting at the bottom of the rack or at the top of a previously
mounted component:
1.
Place the template in the desired location on the front of the rack and
secure it with two push tabs. Make sure that you match the hole pattern
printed on the template with the actual holes on the rack’s vertical rails.
Figure 2-12. Measuring with the template
2.
Use a pencil to mark the top four locations indicated on the template for
the two mounting brackets. These locations are for screws and not cage
units
3.
Use a pencil to mark the bottom two locations indicated on the template
for the cage nuts that will hold the captive thumbscrews on the rack
mount front panel.
4.
Repeat steps 1 and 2 on the back rails of the rack. On the back, these
locations are for four cage nuts. Also mark where the top of the template
is on the rack. This helps align the next components.