![Agilent Technologies 4339B Скачать руководство пользователя страница 210](http://html.mh-extra.com/html/agilent-technologies/4339b/4339b_operation-manual_2867889210.webp)
Measuring
Insulation
Resistance
Time
Characteristics
4339B
5.
P
erform
the
calibration.
Press
.
Select
ExecCal
using
or
and
press
.
6.
P
erform
the
OPEN
correction.
a.
Remove
the
alligator
clips
and
banana
cables
from
the
INPUT
terminal.
b.
Close
the
top
cover
.
c.
Select
the
current
measurement
mode
.
Pressing
.
Select
I
using
or
and
press
.
d.
Apply
test
voltage
by
pressing
.
e.
W
ait
until
the
current
has
stabled
to
within
0.5
pA.
(Displayed
I
value
do
not
change
by
more
than
0.5
pA.)
f.
Press
to
display
the
OPEN
correction
menu.
g.
Select
OpenMeas
using
or
and
press
.
h.
After
the
OPEN
correction
is
nished,
press
to
turn
the
source
voltage
OFF
.
7.
Connect
the
electrodes
of
the
opened
switch
DUT
with
alligator
clips
as
shown
below
.
Close
the
cover
of
the
16339A .
Figure
6-6.
Clipping
Opened
Switch
8.
Select
Resistance
as
the
measurement
parameter
.
Press
.
Select
R
using
or
and
press
.
6-10
Application
Measurement
Содержание 4339B
Страница 10: ......
Страница 18: ... ᄌᦝ 0123 45 6789 8 A B C ᄌᦝ 3 DE FG H FG IJ B C K 9 C Copyright 2007 Agilent Technologies ...
Страница 20: ......
Страница 21: ......
Страница 22: ......
Страница 24: ......
Страница 25: ......
Страница 26: ......
Страница 30: ......
Страница 44: ......
Страница 55: ...4339B Initial Inspection Figure 1 1 Power Cable Supplied Getting Started 1 11 ...
Страница 212: ......
Страница 220: ......
Страница 230: ......
Страница 256: ......
Страница 262: ...4339B Figure B 1 Handler Interface Comparison Output Signals Diagram B 2 Handler Interface Installation ...
Страница 263: ...4339B Figure B 2 Handler Interface Control Output Signals Diagram Handler Interface Installation B 3 ...
Страница 268: ...Procedure 4339B Figure B 5 A1 Main Board B 8 Handler Interface Installation ...