![Agilent Technologies 4339B Скачать руководство пользователя страница 157](http://html.mh-extra.com/html/agilent-technologies/4339b/4339b_operation-manual_2867889157.webp)
4339B
ARM
Subsystem
:ARM[:SEQuence1][:LA
Y
er]:DELay
<numeric
value>
[MS j S]
Sets
the
DUT
charging
time
before
a
DUT
is
measured.
The
charge
time
denes
the
waiting
time
when
the
4339B
triggered
a
measurement
to
when
the
measurement
will
actually
start.
The
test
voltage
is
applied
during
this
time
.
<numeric
value>
is
,
Range
Resolution
0
s
Charge
Time
<
10
s
1
ms
10
s
Charge
Time
<
100
s
10
ms
100
s
Charge
Time
999
s
100
ms
:ARM[:SEQuence1][:LA
Y
er]:SOURce
fBUS j EXT
ernal j MANual j IMMediateg
Sets
the
sequence
measurement
mode
to
ON
or
OFF
,
and
selects
the
source
for
the
ARM
event
detector
.
When
the
ARM
event
is
detected,
the
4339B
enables
the
output
test
voltage
and
applies
the
test
voltage
to
DUT
.
After
charge-time
wait,
4339B
move
from
the
ARM
event
detection
state
to
the
TRIG
event
detection
state
.
When
BUS ,
EXTernal ,
or
MANual
is
selected
as
the
ARM
source
,
the
4339B
automatically
enables
the
test
voltage
output
at
the
time
an
ARM
event
is
detected,
and
applies
the
test
voltage
to
the
DUT
.
After
the
measurement,
the
4339B
automatically
turns
OFF
the
test
voltage
output.
When
IMMediate
is
selected,
the
ARM
event
has
no
eect
on
test
voltage
output
enabling
or
disabling,
you
must
control
test
voltage
output.
Only
one
trigger
source
can
be
specied
at
a
time
for
a
given
event
detector
.
The
available
trigger
sources
are:
P
arameter
Measurement
Sequence
Trigger
Source
BUS
ON
GET
or
*TRG
commands
EXTernal
An
external
trigger
signal
from
external
trigger
terminal
MANual
The
front-panel
key
.
IMMediate
OFF
No
waiting
for
a
ARM
event
to
occur
.
(
The
4339B
immediately
advances
to
the
TRIG
event
detection
state
.)
Query
response
format
is
BUS ,
MAN ,
INT ,
or
IMM .
GPIB
Reference
5-9
Содержание 4339B
Страница 10: ......
Страница 18: ... ᄌᦝ 0123 45 6789 8 A B C ᄌᦝ 3 DE FG H FG IJ B C K 9 C Copyright 2007 Agilent Technologies ...
Страница 20: ......
Страница 21: ......
Страница 22: ......
Страница 24: ......
Страница 25: ......
Страница 26: ......
Страница 30: ......
Страница 44: ......
Страница 55: ...4339B Initial Inspection Figure 1 1 Power Cable Supplied Getting Started 1 11 ...
Страница 212: ......
Страница 220: ......
Страница 230: ......
Страница 256: ......
Страница 262: ...4339B Figure B 1 Handler Interface Comparison Output Signals Diagram B 2 Handler Interface Installation ...
Страница 263: ...4339B Figure B 2 Handler Interface Control Output Signals Diagram Handler Interface Installation B 3 ...
Страница 268: ...Procedure 4339B Figure B 5 A1 Main Board B 8 Handler Interface Installation ...