![Agilent Technologies 4339B Скачать руководство пользователя страница 166](http://html.mh-extra.com/html/agilent-technologies/4339b/4339b_operation-manual_2867889166.webp)
D
A
T
A
Subsystem
4339B
:D
A
T
A[:D
A
T
A]?
IMON
Returns
the
current
monitor
value
.
This
query
needs
parameter
IMON
which
is
the
name
of
the
data
buer
to
read.
Query
response
is
a
numeric
value
in
<NR2>
format.
:D
A
T
A[:D
A
T
A]?
TMON
Returns
the
timer
data
of
the
measurement
sequence
program
(in
seconds
,
or
in
%)
when
the
time
display
function
is
ON.
This
query
needs
parameter
TMON
which
is
the
name
of
the
data
buer
to
read.
Query
response
is
a
numeric
value
in
<NR2>
format.
:D
A
T
A:FEED
DBUF
,<data
handle
>
Sets
or
queries
which
data
is
fed
into
the
data
buer
.
<data
handle>
is
,
"CALCulate"
set
to
feed
the
data
specied
CALCulate:FORMat
command
into
the
data
buer
.
"" (null
string)
set
not
to
feed
data
into
data
buer
The
query
form
requires
parameter
DBUF ,
such
as
DATA:FEED?
DBUF .
Query
response
is
"CALC"
or
null
string.
:D
A
T
A:FEED:CONTrol
DBUF
,f
AL
W
ays
j
NEV
er
g
Sets
or
queries
whether
data
is
fed
into
data
buer
or
not.
The
data
fed
into
the
data
buer
by
this
command
is
specied
by
:DATA:FEED
DBUF
command.
This
command
has
no
eect
when
:DATA:FEED
DBUF
is
set
to
"" (null
string).
Where
,
ALWays
F
eeds
data
into
data
buer
,
whenever
new
data
is
available
NEVer
No
data
is
fed
into
data
buer
The
query
form
requires
parameter
DBUF ,
such
as
DATA:FEED:CONT?
DBUF .
Query
response
is
ALW
or
NEV .
:D
A
T
A:POINts
DBUF
,<numeric
value>
Sets
or
queries
the
size
of
data
buer
,
DBUF .
Y
ou
can
store
as
many
measurement
point
data
sets
into
DBUF
as
dened
by
this
command.
<numeric
value>
is
,
numeric
1
to
500
The
query
form
requires
parameter
DBUF ,
such
as
:DATA:POINts?
DBUF .
Query
response
is
a
numeric
value
in
<NR1>.
5-18
GPIB
Reference
Содержание 4339B
Страница 10: ......
Страница 18: ... ᄌᦝ 0123 45 6789 8 A B C ᄌᦝ 3 DE FG H FG IJ B C K 9 C Copyright 2007 Agilent Technologies ...
Страница 20: ......
Страница 21: ......
Страница 22: ......
Страница 24: ......
Страница 25: ......
Страница 26: ......
Страница 30: ......
Страница 44: ......
Страница 55: ...4339B Initial Inspection Figure 1 1 Power Cable Supplied Getting Started 1 11 ...
Страница 212: ......
Страница 220: ......
Страница 230: ......
Страница 256: ......
Страница 262: ...4339B Figure B 1 Handler Interface Comparison Output Signals Diagram B 2 Handler Interface Installation ...
Страница 263: ...4339B Figure B 2 Handler Interface Control Output Signals Diagram Handler Interface Installation B 3 ...
Страница 268: ...Procedure 4339B Figure B 5 A1 Main Board B 8 Handler Interface Installation ...