![Agilent Technologies 1290 Infinity II 2D-LC Solution Скачать руководство пользователя страница 323](http://html1.mh-extra.com/html/agilent-technologies/1290-infinity-ii-2d-lc-solution/1290-infinity-ii-2d-lc-solution_user-manual_2867575323.webp)
2D-LC User Guide
323
12
Maintenance
Correcting Leaks
Correcting Leaks
Correcting Leaks (G7116B)
1
Remove the door.
2
Use a pipette and tissue to dry the leak sensor area.
3
Observe the capillary connections and the column switching valve for leaks
and correct, if required.
4
Reinstall the door.
Correcting Leaks (G1170A)
1
Use a pipette and tissue to dry the leak sensor area.
2
Observe the capillary connections and the valve for leaks and correct, if
required.
When
If a leakage has occurred at the heat exchanger or at the capillary connections or at the column
switching valve.
Tools required
Description
Tissue
Pipette
Wrench, 1/4 – 5/16 inch
(for capillary connections)
When
If leakage has occured at the capillary connections or at the valve.
Tools required
Description
Tissue
Pipette
Wrench, 1/4 – 5/16 inch
(for capillary connections)
Содержание 1290 Infinity II 2D-LC Solution
Страница 122: ...5 2D LC Data Acquisition in MassHunter Workstation 11 Instrument Details 2D LC User Guide 122 3 Click Screen 4 Click OK...
Страница 263: ...2D LC User Guide 263 9 Data Analysis GC Image Basic Information 3 Import parameters...
Страница 264: ...9 Data Analysis GC Image Basic Information 2D LC User Guide 264 4 Fit view...
Страница 267: ...2D LC User Guide 267 9 Data Analysis GC Image Basic Information 11 View single 2D chromatograms 12 Select blobs...