5-43
CHAS
HANDLEBAR
2. Install:
9
Grip cap (upper)
1
9
Grip cap (lower)
2
9
Bolt (grip cap)
3
NOTE:
Temporarily tighten the bolts (grip cap).
EC5B5210
Handlebar
1. Install:
9
Handlebar
1
9
Handlebar holder
2
9
Bolt (handlebar holder)
3
NOTE:
9
The upper handlebar holder should be
installed with the punched mark
a
forward.
9
First tighten the bolts on the front side of the
handlebar holder, and then tighten the bolts on
the rear side.
2. Install:
9
Grip (left)
1
Apply the adhesive to the handlebar
2
.
NOTE:
9
Before applying the adhesive, wipe off grease
or oil on the handlebar surface
a
with a lac-
quer thinner.
9
Install the grip (left) to the handlebar so that
the line
b
between the two arrow marks faces
straight upward.
3. Install:
9
Collar
1
9
Cap cover
2
9
Throttle
3
NOTE:
9
Apply the lithium soap base grease on the
throttle grip sliding surface.
9
Tighten the grip cap bolts temporarily without
the throttle being fixed to the handlebar.
28 Nm (2.8 m•kg, 20 ft•lb)
5NY-9-30-5C 5/23/01 9:10 PM Page 8
Summary of Contents for YZ125(P)/LC
Page 128: ...3 3 INSP ADJ MEMO...
Page 286: ...4 37 ENG CLUTCH AND PRIMARY DRIVEN GEAR 4 Install 9Plain washer 1 9Circlip 2...
Page 562: ...TUN MEMO...
Page 563: ......