5-9
CHAS
FRONT WHEEL AND REAR WHEEL
8. Install:
9
Chain puller (right)
1
9
Plain washer
2
9
Nut (wheel axle)
3
NOTE:
Temporarily tighten the nut (wheel axle) at this
point.
9. Adjust:
9
Drive chain slack
a
Refer to “DRIVE CHAIN SLACK ADJUSTMENT”
section in the CHAPTER 3.
10. Tighten:
9
Nut (wheel axle)
1
9
Locknut
2
125 Nm (12.5 m•kg, 90 ft•lb)
Drive chain slack :
40~50 mm (1.6~2.0 in)
5NY-9-30-5A 5/23/01 9:00 PM Page 18
Summary of Contents for YZ125(P)/LC
Page 128: ...3 3 INSP ADJ MEMO...
Page 286: ...4 37 ENG CLUTCH AND PRIMARY DRIVEN GEAR 4 Install 9Plain washer 1 9Circlip 2...
Page 562: ...TUN MEMO...
Page 563: ......