4-45
ENG
KICK AXLE, SHIFT SHAFT AND PRIMARY DRIVE
GEAR
5. Install:
9
Crankcase cover (right)
1
NOTE:
9
Position the rack
a
on the push rod backward.
9
Mesh the governor gear
2
, and impeller shaft
gear
3
with primary drive gear
4
.
6. Install:
9
Bolt [crankcase cover (right)]
1
NOTE:
Tighten the bolts in stage, using a crisscross
pattern.
7. Install:
9
Kick starter
1
9
Plain washer
2
9
Bolt (kick starter)
3
NOTE:
Install the kick starter closest to but not contact-
ing the pillar tube
4
.
8. Install:
9
Shift pedal
1
9
Bolt (shift pedal)
2
NOTE:
Install the shift pedal so that the top of the shift
pedal outer diameter
a
is highest without ex-
ceeding the line
b
connecting the center of the
shift shaft and the bottom of the screw
[crankcase cover (left)]
3
.
9. Check:
9
Push lever position
Refer to “CLUTCH AND PRIMARY DRI-
VEN GEAR” section.
10 Nm (1.0 m•kg, 7.2 ft•lb)
10 Nm (1.0 m•kg, 7.2 ft•lb)
10 Nm (1.0 m•kg, 7.2 ft•lb)
5NY-9-30-4C 5/23/01 8:56 PM Page 16
Summary of Contents for YZ125(P)/LC
Page 128: ...3 3 INSP ADJ MEMO...
Page 286: ...4 37 ENG CLUTCH AND PRIMARY DRIVEN GEAR 4 Install 9Plain washer 1 9Circlip 2...
Page 562: ...TUN MEMO...
Page 563: ......