6 - 17
–
+
ELEC
CHARGING SYSTEM
EC624000
COUPLERS AND LEADS CONNECTION
INSPECTION
1. Check:
●
Couplers and leads connection
Rust/dust/looseness/short-circuit
→
Repair or replace.
CHARGING VOLTAGE INSPECTION
1. Start the engine.
2. Inspect:
●
Charging voltage
Out of specification
→
If no failure is
found in checking the source coil resis-
tance, replace the rectifier/regulator.
Tester (+) lead
→
Red lead
1
Tester (–) lead
→
Black lead
2
Charging
voltage
Tester selector
position
14.0 ~ 15.0 V at
5,000 r/min
DCV-20
W
B
R
Y
2
1
3. Inspect:
●
Charging coil resistance
Out of specification
→
Replace.
Tester (+) lead
→
White lead
1
Tester (–) lead
→
Black lead
2
Charging coil
resistance
Tester selector
position
0.64 ~ 0.96
Ω
at
20 ˚C (68 ˚F)
Ω
×
1
W Sb
Y B
1
2
Summary of Contents for TT-R125E(R)
Page 47: ...GEN INFO MEMO...
Page 147: ...SPEC MEMO...
Page 169: ...INSP ADJ MEMO...
Page 236: ...3 37 INSP ADJ Charging method using a variable voltage charger BATTERY INSPECTION AND CHARGING...
Page 237: ...3 38 INSP ADJ Charging method using a constant voltage charger BATTERY INSPECTION AND CHARGING...
Page 541: ...ELEC MEMO...
Page 553: ...ELEC MEMO...
Page 573: ...ELEC MEMO...
Page 576: ......
Page 577: ......