3 - 39
INSP
ADJ
6. Install:
●
Battery
7. Check:
●
Battery terminals
Dirt
→
Clean with a wire brush.
Loose connection
→
Connect properly.
8. Lubricate:
●
Battery terminal
9. Connect:
●
Battery leads
(to the battery terminals)
CAUTION:
First, connect the positive lead
1
, then the
negative lead
2
.
10. Install:
●
Battery cover
FUSE INSPECTION
CAUTION:
To avoid a short circuit, always set the
main switch to “OFF” when checking or
replacing a fuse.
1. Remove:
●
Battery cover
2. Check:
●
Continuity
2
Reserve fuse
Recommended lubricant
Lithium soap base grease
Checking steps:
●
Remove the fuse
1
.
●
Connect the pocket tester to the fuse and
check the continuity.
NOTE:
Set the pocket tester selector to “
Ω
×
1”.
Pocket tester
YU-03112-C/90890-03112
●
If the pocket tester indicates “
∞
”, replace
the fuse.
1
2
1
2
FUSE INSPECTION
Summary of Contents for TT-R125E(R)
Page 47: ...GEN INFO MEMO...
Page 147: ...SPEC MEMO...
Page 169: ...INSP ADJ MEMO...
Page 236: ...3 37 INSP ADJ Charging method using a variable voltage charger BATTERY INSPECTION AND CHARGING...
Page 237: ...3 38 INSP ADJ Charging method using a constant voltage charger BATTERY INSPECTION AND CHARGING...
Page 541: ...ELEC MEMO...
Page 553: ...ELEC MEMO...
Page 573: ...ELEC MEMO...
Page 576: ......
Page 577: ......