
5 - 42
CHAS
HANDLEBAR
TT-R125LWE
Extent of removal:
1
Handlebar removal
Extent of removal
Order
Part name
Q’ty
Remarks
Preparation for removal
HANDLEBAR REMOVAL
Number plate
1
Clutch cable
1
2
Clutch lever
1
3
Engine stop switch
1
4
Brake master cylinder
1
Refer to “REMOVAL POINTS”.
5
Start switch
1
6
Grip cap (lower)
1
7
Grip cap (upper)
1
8
Throttle cable
1
9
Throttle grip assembly
1
10
Handlebar grip (left)
1
Refer to “REMOVAL POINTS”.
11
Main switch
1
12
Upper handlebar holder
2
13
Handlebar
1
1
Summary of Contents for TT-R125E(R)
Page 47: ...GEN INFO MEMO...
Page 147: ...SPEC MEMO...
Page 169: ...INSP ADJ MEMO...
Page 236: ...3 37 INSP ADJ Charging method using a variable voltage charger BATTERY INSPECTION AND CHARGING...
Page 237: ...3 38 INSP ADJ Charging method using a constant voltage charger BATTERY INSPECTION AND CHARGING...
Page 541: ...ELEC MEMO...
Page 553: ...ELEC MEMO...
Page 573: ...ELEC MEMO...
Page 576: ......
Page 577: ......