
Chapter 2 Installation and Connections
2-23
2-4-7
R5/R10/R20
To install the R5/R10/R20 robot, tap holes into the installation base and secure the robot to the
base as shown below.
WARNING
Always turn off the power to the controller before installing the robot. Serious acci-
dents might occur if the robot starts to operate during installation.
●
Installation method
Tap holes into the installation base where the robot is to be secured.
For hole diameter and pitch, see the external view and dimensions in “5.1 Robot Specifications”
of Chapter 5.)
M6 bolt
Installation base
\
M6 bolt
Installation base
Summary of Contents for FLIP-X Series
Page 1: ...User s Manual ENGLISH E YAMAHA SINGLE AXIS ROBOT E21 Ver 1 15 FLIP Xseries ...
Page 2: ......
Page 6: ...MEMO ...
Page 10: ...MEMO ...
Page 12: ...1 2 MEMO ...
Page 24: ...1 14 MEMO ...
Page 26: ...2 2 MEMO ...
Page 66: ...3 2 MEMO ...
Page 78: ...4 2 MEMO ...
Page 98: ...4 22 MEMO ...
Page 100: ...5 2 MEMO ...
Page 120: ...5 22 MEMO ...
Page 121: ...Chapter 6 Troubleshooting 6 1 Positioning error 6 3 6 2 Feedback error 6 4 ...
Page 122: ...6 2 MEMO ...
Page 125: ...Appendix About machine reference iii Equation of moment of inertia calculation iv ...
Page 126: ...ii MEMO ...