Page 20
4.6
Operating the autoclave
1. Plug the power cord into the power socket.
2. Turn on the Main Switch / Circuit Breaker (see front view).
3. Select "Vacuum Test" cycle to keep the steam generator and heating
elements from heating up.
4. Fill the Mineral Free Water Reservoir with water meeting the quality
specs in sec.
错误
!
未找到引用源。
with water (see "Filling the Mineral-
Free Water Reservoir" in the Operation and maintenance manual) as
follows: Fill with 4 liters of mineral free water by pouring it into the front
reservoir fill opening at the top of the machine or through the front funnel
(see front view).
5. Open the door of the autoclave and remove the trays and the packaging
material.
6. Insert a paper roll in the printer (see printer handling chapter of the user
manual).
7. Close the door and perform a Vacuum Test. If the test fails perform
another test since the fail may be a result of moisture in the air. If the
second test fails it may
be necessary to run Program 2 with the long
drying cycle to remove any excess moisture that is causing the test to
fail.
8. If the Vacuum Test is successful then select the B&D Test cycle.
9. At this stage the chamber and steam generator will be heating up. It will
take approximately 15 minutes (from selecting the B&D Test).
10. While waiting for the unit to heat up explain and instruct the operator as
follows (use the operation manual as reference):
Operation principles of the autoclave.
Preparation for sterilizing instruction including loading instructions.
Intended use of each cycle.
Selecting a cycle.
Water filling method.
Displayed error and operational messages.
Monitoring and changing parameters.
Printer handling.
Maintenance instructions
11. Perform a B&D test with a chemical indicator.
12. The operator shall perform a cycle under supervision of the technician.
4.7
Final adjustments
Once the autoclave is installed, the following operations have to be performed
before operating any cycle:
1. Setting clock and date (See instruction in the user manual).
2. Adjust the atmospheric pressure according to the altitude of the
autoclave (See 9.8, reset atmospheric pressure)
www.shanghaidelan.com 021-54263653
Summary of Contents for ELARA11-D
Page 163: ...Page 162 Piping Diagram w w w s h a n g h a i d e l a n c o m 0 2 1 5 4 2 6 3 6 5 3...
Page 164: ...Page 163 w w w s h a n g h a i d e l a n c o m 0 2 1 5 4 2 6 3 6 5 3...
Page 165: ...Page 164 w w w s h a n g h a i d e l a n c o m 0 2 1 5 4 2 6 3 6 5 3...
Page 166: ...Page 165 w w w s h a n g h a i d e l a n c o m 0 2 1 5 4 2 6 3 6 5 3...
Page 167: ...Page 166 w w w s h a n g h a i d e l a n c o m 0 2 1 5 4 2 6 3 6 5 3...
Page 168: ...Page 167 w w w s h a n g h a i d e l a n c o m 0 2 1 5 4 2 6 3 6 5 3...
Page 169: ...Page 168 Electric Diagram w w w s h a n g h a i d e l a n c o m 0 2 1 5 4 2 6 3 6 5 3...
Page 170: ...Page 169 w w w s h a n g h a i d e l a n c o m 0 2 1 5 4 2 6 3 6 5 3...
Page 171: ...Page 170 w w w s h a n g h a i d e l a n c o m 0 2 1 5 4 2 6 3 6 5 3...
Page 172: ...Page 171 w w w s h a n g h a i d e l a n c o m 0 2 1 5 4 2 6 3 6 5 3...
Page 173: ...Page 172 w w w s h a n g h a i d e l a n c o m 0 2 1 5 4 2 6 3 6 5 3...
Page 174: ...Page 173 w w w s h a n g h a i d e l a n c o m 0 2 1 5 4 2 6 3 6 5 3...
Page 175: ...Page 174 w w w s h a n g h a i d e l a n c o m 0 2 1 5 4 2 6 3 6 5 3...
Page 176: ...Page 175 w w w s h a n g h a i d e l a n c o m 0 2 1 5 4 2 6 3 6 5 3...