The "Ready" field is not reset to "0" after deselecting and
reloading the job. Jobs can thus be interrupted and resumed
at a later time with the last quantities.
Execution is finished when the finished items counter
reaches the defined lot size.
12. Enter the number of blanks in the "Advance warning quan-
tity" field, above which the control displays the information for
every change in quantity: "Job X in Y blanks finished".
The "Customer" and "Number" may be defined, but do not have
to be.
13. Click on the "Customer" or "Number" field.
14. Enter the customer name or job number.
15. Press
OK
.
The current project status is displayed under "Status":
Symbol
Description
No job selected or error.
Job selected, without errors.
Stacks have been defined.
Job has been loaded.
Job is ready.
The job is available, but has not yet been selected for
automatic execution (gray).
Tab. 4-8
16. Press
Update
.
The view is updated, e. g. after jobs have been deleted.
17.
Parts data
18. In the drop-down menu, press
Unprocessed material
,
Fin-
ished part
or, if available,
Intermediate layer part
.
The selected parts data is displayed:
4
‐
54
Running in a TruTops program
2015-06-01
B579EN
Setting the advance warning
for quantities
Entering the customer and
job number
Updating the view
Having parts data displayed
Summary of Contents for BendMaster 150
Page 1: ...Operator s manual BendMaster TruBend Cell 5000...
Page 2: ......
Page 3: ...Operator s manual BendMaster TruBend Cell 5000 Original operator s manual Edition 2015 06 01...
Page 6: ...II Before you proceed 2015 06 01 B579EN...
Page 16: ...0 10 Table of contents 2015 06 01 B579EN...
Page 44: ...1 28 Disassembly and disposal 2015 06 01 B579EN...