Medium Optical Disk (RW551/RW552) Library
3–6
EK–MOL80–SV. B01
4.
Plug the power cord into the power outlet.
5. Press the power switch located on the top right end of the jukebox to ON.
Initially, the control panel displays
TESTING
. Once the power-on test
completes (approximately 1.5 minutes), the control panel displays
READY
.
NOTE
A sequence of tests are run when the jukebox
is first switched on. The READY status on the
control panel indicates that the jukebox is
ready of operation. If a FAIL1 status appears
on the control panel display, refer to Chapter
4, "Troubleshooting and Diagnostics," for
information on how to resolve the problem.
Control Panel Operation
Figure 3–3 The Jukebox Control Panel