Operation and Maintenance Manual (DTR) iSWAY
®
Set of products
Version 1.8 of 2.2021
109
I.
Instructions for checking the cleanliness of the infrared heater - iSWAY-FC-0 (SzA-
FCP)
Step 1.
The inspection panel should be removed.
For this purpose we dismantle the yoke joints (6 in total) placed in the vertical plane
of the device.
Step 2.
Then dismantle the inspection panel in the bulkhead wall on which the automation
devices are hung .
After removing the inspection sheet, the heater is located to the right of the window.