Operation and Maintenance Manual (DTR) iSWAY
®
Set of products
Version 1.8 of 2.2021
164
e)
To ensure safe access to manual triggering mechanisms of the flaps, if any, access panels
must be placed.
(…)
Recommendations of SMAY Sp. Z o.o. concerning the maintenance of the system and
personnel performing weekly, monthly and annual tests:
1.
The system should be tested on a weekly, monthly and annual basis.
2.
Once a year a comprehensive review of the system should be carried out, including annual
testing and maintenance activities.
3.
Weekly, monthly and annual tests should be performed based on the recommendations of
PN-EN12101-6:2007.
4.
Weekly and monthly tests should be carried out by building service personnel trained by
the system manufacturer.
5.
Monthly tests should be carried out by building service personnel trained by the system
manufacturer.
6.
Annual tests should be carried out by the system manufacturer or by a qualified service
technician authorized by the system manufacturer.
Annual tests should be carried out during the annual system inspection.
18.5.
Battery handling
In the event of a power failure, it is not possible to recharge the batteries, which, however,
provide the energy needed to sustain operation. The power failure must be rectified immediately
to avoid disconnection on deep discharge, recharge the batteries and guarantee safe operation. If
the batteries are critically low and not recharged after just a few days there is a danger of
permanent damage to the batteries.
Batteries are recommended to be tested at least once a year. In the event of
decommissioning or temporary shutdown, disconnect the batteries to avoid deep discharge or
damage. Charged but unconnected batteries can be stored for about 6 months. If stored for a
longer period of time, they must be recharged.
19.
Health and Safety Instructions
1.
Connection and start-up of iSWAY-
FC®, iSWAY
-
WFC®, iSWAY
-
RFC® devices should be
carried out by qualified personnel under conditions corresponding to the applicable
regulations, especially in terms of operating the electrical equipment in accordance with
the electrical and automation design for the facility/system.
2.
Do not apply mains voltage before connecting the unit to the protective system.
3.
It is forbidden to carry out any repair and maintenance work without first turning off the
power.
4.
Operating the unit with the inspection panel removed from any section of aeration units is
forbidden.