Operation and Maintenance Manual (DTR) iSWAY
®
Set of products
Version 1.8 of 2.2021
114
III.
Instructions for checking the cleanliness of the infrared heater - iSWAY-FC-2 (SzA-
FCP)
Step 1.
Remove 2 inspection panels.
For this purpose we dismantle the yoke joints (4 per each panel, 8 in total) placed in
the vertical plane of the device.
Step 2.
Then dismantle the inspection panel in the bulkhead wall on which the automation
devices are hung .
After removing the inspection sheet, the heater is located to the right of the window.