Page 56
HydroRanger 200 – INSTRUCTION MANUAL
7ML19985FC03
mmmm
m
Pu
m
p
C
o
n
tr
o
l
Pump Control
Setting a Pump Down Group
Example: Sewage Wet Well
Setting a group of three pumps to pump down a wet well.
Set the Common Parameters
Prerequisite: Substitute the details of your application in place of the sample values
provided. If you are bench testing the unit, set your test values to be the same as the
sample values.
Parameter
Index
1
1.
Example assumes a single measurement unit. If your HydroRanger 200
has dual point software installed then some parameters are indexed by
two.
Value
Description
P001
G
1
Operation = level
P002
G
1
Material = liquid
P003
G
2
Maximum Process Speed = medium
P004
G
102
Transducer = XPS-10
P005
G
1
Units = meters
P006
G
1.8
Empty = 1.8 m
P007
G
1.4
Span = 1.4 m
HydroRanger 200
P006
P007
Inflow
Outflow
Summary of Contents for HydroRanger 200
Page 1: ...Instruction Manual July 2009 200 hydroranger ...
Page 232: ...Page 222 HydroRanger 200 INSTRUCTION MANUAL 7ML19985FC03 mmmmm Parameters Notes ...
Page 264: ...Page 254 HydroRanger 200 INSTRUCTION MANUAL 7ML19985FC03 mmmmm Appendix H Software Rev Notes ...
Page 278: ...Notes ...
Page 279: ......