IntelliVue Telemetry System Infrastructure Installation and Service Guide
5
-
1
5
Troubleshooting and Testing
This chapter provides procedures you should follow to inspect and verify
your IntelliVue Telemetry System, and includes:
• ITS Access Point Test and Inspection Procedures
• ITS Access Point Controller Test and Inspection Procedures
• ITS Sync Unit Test and Inspection Procedures
• ITS Power over Ethernet Unit Test and Inspection Procedures
• ITS Uninterruptible Power Supply Test and Inspection Procedures
• ITS Network Switch Test and Inspection Procedures
• Troubleshooting Known Issues
• Importing ITS Configuration Files
Note
You must follow the tests and inspections provided in this chapter after
you initially install the IntelliVue Telemetry System and also after you
perform any service event on the ITS.
Summary of Contents for IntelliVue Telemetry System Infrastructure
Page 8: ...viii Contents ...
Page 14: ...xiv About This Guide ...
Page 100: ...3 22 Chapter 3 Installing and Configuring the ITS Figure 3 10 APC Filter Configuration Screen ...
Page 162: ...5 12 Chapter 5 Troubleshooting and Testing ...
Page 168: ...A 6 Chapter A Installing Multiple ITSs at a Single Hospital Site ...
Page 180: ...Index 8 Index ...