2-66
Maintenance Utilities
VU-ACD™/100 Maintenance Guide – Host/DOS
Step
Prompt
Action
?
The prompts shown in Step 14 will vary depending on the type of DigiBoard being
installed. Refer to the DigiWARE documentation for additional details.
14
Configuring epca driver...
Creating Space.c file...
Major device number for epca is <No.>
Major device number for epc1 is <No.
Creating Master and System files...
EPCA device drivers installed
Do you really want to rebuild the kernel
now (y/n)?
Type
y
but do not press
Enter
!
15
The UNIX Operating System will now be rebuilt,
this will take a few minutes. Please wait...
The kernel has been successfully linked and installed
to activate it, reboot your system
Press any key to continue:
Press
Enter
.
16
<MPI Configuration Menu>
<MPI Main Menu>
Press
Esc
.
Press
Esc
.
Configuration changes won’t take affect
until the system is rebooted.
17
SYSTEM HARDWARE CONFIGURATION
1) Node Configuration
2) Maintenance Modem Configuration
3) Tape Configuration
4) Multiport Serial I/O Configuration
5) System Printer Configuration
6) Reset All External Displays
Select an option or ‘q’ to quit:
Type
q
and press
Enter
.
18
MAINTENANCE MENU
1) Shut Down ACD MIS
2) Shut Down ACD MIS & UNIX System
3) Tape Backup/Restore Utilities
4) System Logs
5) Load Management Limits
6) Change Maintenance Logon Password
7) System Hardware Configuration
8) Install a Software Update
9) Request Switch Initialization
10) 5ESS Provisioning
11) List Logged-In Users
Select an option, or enter q to quit:
To reboot the system, type
2
and press
Enter
to
select Shut Down ACD MIS & UNIX System.
Refer to Section 2.1.2.2 for details about the
reboot procedure.