5-26
Configuration Changes
VU-ACD™/100 Maintenance Guide – Host/DOS
5.5.2.11
Schedule Port
(continued
)
Step
Description
Reference
3
Install the datacomm connection between the VU-ACD/100
host and the FMS host, or between the VU-ACD/100 remote
terminal and the FMS host.
FMS Documentation Set
Host Installation Guide
4
Use the VU-ACD/100 Device Configuration screen to
configure the new Schedule port.
System Administration Gd.
5
Verify that Schedule data is being up-/downloaded to/from
the FMS.
FMS Documentation Set
Host Installation Guide
5.5.2.12
InterLink Port
Step
Description
Reference
1
Assign the serial port on the DigiBoard to which the Inter-
Link data will be output.
IMPORTANT: To enable output, the security device must be
programmed to allow an InterLink output port to be
assigned. For additional information contact Perimeter
Technology Product Support.
Host Installation Guide
2
Install a serial datacomm or LAN connection between the
VU-ACD/100 host with the InterLink output and the
VU-ACD/100 host which will receive the data.
Host Installation Guide
3
Use the VU-ACD/100 Device Configuration screen at the
sending VU-ACD/100 host to configure the new InterLink
output port.
System Administration Gd.
4
At the receiving VU-ACD/100 host, use System Hardware
Option–Node Configuration under the Maintenance Menu to
configure the InterLink input port.
Maintenance Guide
5
Use the Link Log and Event Log options under the Mainte-
nance Menu to verify that fedlog data is being received at
the receiving VU-ACD/100 host.
Maintenance Guide