![Perimeter Technology VU-ACD /100 Maintenance Manual Download Page 57](http://html.mh-extra.com/html/perimeter-technology/vu-acd-100/vu-acd-100_maintenance-manual_1529976057.webp)
2-39
VU-ACD™/100 Maintenance Guide – Host/DOS
Maintenance Utilities
Step
Prompt
Action
3D
[default: ttyi2A ] : [ ]
Type
R
and press
Enter
to delete the serial port
number shown as the default.
If multiple ports are already assigned for this
node, Step 3B reappears with the next port
shown as a default. Up to four ports can be
removed in this fashion.
Type
D
and press
Enter
to return to Step 3B.
3E
When the desired number of ports have been
configured, choose another configuration para-
meter to change or proceed to Step 6.
4A
3) Baud rate
9600
Type
3
and press
Enter
to change the baud
rate.
NOTE: All ports will be set to the same baud rate
.
4B
Baud rates supported are:
1) 9600
Select the baud rate: [ }
Type
1
and press
Enter
to select the only baud
rate currently supported. The View/Modify
5ESS Node Configuration Menu reappears.
Choose another node configuration parameter
to change or proceed to Step 6.
5A
4) Switch version number
12/13
Type
4
and press
Enter
to change the switch
version number.
5B
Switch versions supported are:
1) 11
2) 12/13
Select the Switch version [ }
Type the number corresponding to the desired
switch version and press
Enter
. The View/-
Modify 5ESS Node Configuration Menu
reappears.
Choose another node configuration parameter
to change or proceed to Step 6.
6
Select a parameter to modify or “q” to
quit:
Save the modifications (y/n) ?
Type
q
and press
Enter
to quit the View/-
Modify 5ESS Node Configuration Menu.
Type
y
and press
Enter
to save the changes
made to this menu before returning to the
View/Modify Node Configuration Menu.
Proceed to Step 7.
– or –
Type
n
and press
Enter
to return to the View/-
Modify Node Configuration Menu without
saving changes made to this menu. Proceed to
Step 7.
7
<System Hardware Options Menu>
Type
q
and press
Enter
to return to the Mainte-
nance Menu.
IMPORTANT: The 5ESS Node must be provi-
sioned prior to switch initialization. Refer to
Section 2.9 for details.