159
Se
tt
ing I
n
s
p
e
c
tio
n C
on
d
it
ions
C
h
ap
te
r 4
INDE
X
In the case of Execution Mode = Pitch
The procedure described below is for area setting and other inspection conditions when Execution Mode is set
to “Pitch”.
Setting an Inspection Area
You cannot set a Mask Area in Connector checker.
1.
Select “Area Setting” in “Connector (Gra. Edg.)” setting window.
2.
Select "Area Setting".
“Area Setting” window is displayed.
3.
Move the area to inspecting area by operating the
ENTER key and press the ENTER key to fix the
position.
4.
Move the start point and fix it. Then, move the end
point and fix it.
The position of the start point is a start point of scan of
the first Gray Edge.
5.
Set the size (W) of Gray Edge cells which detect
edges of pins.
Set the size to surround a pin with a cell.
The widths in X and Y directions of a cell are defined
as the figures shown on the right.
6.
Tilt the ENTER key left/right to specify the number
of cells, and press the ENTER key to fix it.
Set the number of cells to the same as the number of
pins to be measured.
X
(ENTER key,
left/right)
Y
(ENTER key,
up/down)
ST
X coordinate of
the start point
Y coordinate of
the start point
ED
X coordinate of
the end point
Y coordinate of
the end point
W
Width-X of cell
Width-Y of cell
N
Number of cells
(Max. 100)
Setting Edge Conditions
For the information of the conditions listed below, refer to the chapter of Gray Edge checker (page 110).
•
Inspection Condition - "Scan Method”, “Edge Condition", and Front and Peak of “Detected Position”
•
Search Method
About Detected Position: Center
“Center” setting detects two points in a cell and outputs
the middle point of them as detect position and the
distance between the middle points of each cell as
Pitch.
The detected point closer to the start point is Edge
0 and the other is Edge 1. Set edge conditions for
each edge, Edge Condition 0 and Edge Condition
1.
Summary of Contents for PV-500
Page 1: ......
Page 10: ......
Page 11: ...9 Names and Descriptions Chapter 1 INDEX Chapter 1 Names and Descriptions ...
Page 21: ...19 Installation and Wiring Chapter 2 INDEX Chapter 2 Installation and Wiring ...
Page 37: ...35 Basic Operation Chapter 3 INDEX Chapter 3 Basic Operation ...
Page 55: ...53 Setting Inspection Conditions Chapter 4 INDEX Chapter 4 Setting Inspection Conditions ...
Page 345: ...343 Chapter 7 Changing Configuration INDEX Chapter 7 Changing Configuration TOOL ...
Page 375: ...373 Operation and Data Output through I O Terminals Chapter 8 INDEX ...
Page 390: ......
Page 391: ...389 Control with Communication Port Chapter 9 INDEX Chapter 9 Control with Communication Port ...
Page 430: ......
Page 431: ...429 PVWIN Chapter 10 INDEX Chapter 10 PVWIN ...
Page 493: ......
Page 494: ......