381
O
pe
ra
tio
n a
n
d D
a
ta
O
ut
put
t
hr
ou
gh I
/O
T
e
rm
ina
ls
C
h
ap
te
r 8
INDE
X
7. After the second image capturing is completed, PV executes checkers. If the first data has been
output at the time, REN0 signal is turned on. If it has not, PV waits until the data is output and turns
on REN0 signal.
After REN0 signal turns on, PV500 can receive STA0 signal (or capture and image).
At the timing when it starts capturing the next image, input STA0 signal.
Setting “Image Output” to “Async.(inspection first)” turns on REN0 signal and allows capturing the third
image after the second image capturing or the first synchronous result output (general output through I/O
and synchronously) whichever completed later, before outputting the general result and the image of the
first inspection is completed.
Summary of Contents for PV-500
Page 1: ......
Page 10: ......
Page 11: ...9 Names and Descriptions Chapter 1 INDEX Chapter 1 Names and Descriptions ...
Page 21: ...19 Installation and Wiring Chapter 2 INDEX Chapter 2 Installation and Wiring ...
Page 37: ...35 Basic Operation Chapter 3 INDEX Chapter 3 Basic Operation ...
Page 55: ...53 Setting Inspection Conditions Chapter 4 INDEX Chapter 4 Setting Inspection Conditions ...
Page 345: ...343 Chapter 7 Changing Configuration INDEX Chapter 7 Changing Configuration TOOL ...
Page 375: ...373 Operation and Data Output through I O Terminals Chapter 8 INDEX ...
Page 390: ......
Page 391: ...389 Control with Communication Port Chapter 9 INDEX Chapter 9 Control with Communication Port ...
Page 430: ......
Page 431: ...429 PVWIN Chapter 10 INDEX Chapter 10 PVWIN ...
Page 493: ......
Page 494: ......