
152
Se
tt
ing I
n
s
p
e
c
tio
n C
on
d
it
ions
C
h
ap
te
r 4
Specifying Checker No.
1.
Select “Connector (Gra. Edg.)” in "Checker Type".
2.
Select the checker No. list and specify a checker
number to set.
3.
Press the ENTER key to determine the checker No.
“Connector (Gra. Edg.)” setting window is displayed. The
gray image is displayed on the screen window.
Selecting a Camera
Select a camera image to set Connector (Gray Edge) checker.
1.
Select “Area Setting” in “Connector (Gra. Edg.)” setting window.
2.
Select a camera No. in “Camera”.
The selected camera image is displayed.
Select a displayed image type (Live/Memory or Gray/Binary) or magnification in “Image Menu” opened by
pressing the F1 key.
Selecting Preprocess / Slice Level / Position
Adjustment
Selecting an Execution Mode and Checker Direction
Connector (Gray Edge) checker has four execution modes. Select one of them according to your inspection
purpose.
Checker Direction is to set a start point and an end point of an area horizontally or vertically. Changing either of
Execution Mode or Checker Direction clears an inspection area. Set them before drawing an area.
1.
Select “Inspection Condition” in “Connector (Gra. Edg.)” setting window.
2.
Select one of four modes for
“Execution Mode”.
When the dialog message appears,
select “YES".
3.
Select “Horizontal” or “Vertical” in
"Checker Direction".
When the dialog message appears,
select “YES".
Now, selecting Execution Mode and
Checker Direction is complete.
Execution Mode = Pitch
Execution Mode
= Width Measurement
Summary of Contents for PV-500
Page 1: ......
Page 10: ......
Page 11: ...9 Names and Descriptions Chapter 1 INDEX Chapter 1 Names and Descriptions ...
Page 21: ...19 Installation and Wiring Chapter 2 INDEX Chapter 2 Installation and Wiring ...
Page 37: ...35 Basic Operation Chapter 3 INDEX Chapter 3 Basic Operation ...
Page 55: ...53 Setting Inspection Conditions Chapter 4 INDEX Chapter 4 Setting Inspection Conditions ...
Page 345: ...343 Chapter 7 Changing Configuration INDEX Chapter 7 Changing Configuration TOOL ...
Page 375: ...373 Operation and Data Output through I O Terminals Chapter 8 INDEX ...
Page 390: ......
Page 391: ...389 Control with Communication Port Chapter 9 INDEX Chapter 9 Control with Communication Port ...
Page 430: ......
Page 431: ...429 PVWIN Chapter 10 INDEX Chapter 10 PVWIN ...
Page 493: ......
Page 494: ......