Before You Start
FP0
iii
Power supply sequence
Have the power supply sequence such that the power
supply of the FP0 control unit turns OFF before the
power supply for I/O.
If the power supply for I/O is turned OFF before the
power supply of FP0 control unit, the FP0 control unit
will detect the input fluctuations and may begin an
unscheduled operation.
Before turning ON the power
When turning ON the power for the first time, be sure to take the precautions given
below.
When carrying out construction, check to make sure that
there are no scraps of wiring, particularly conductive
fragments, adhering to the unit.
Verify that the power supply wiring, I/O wiring, and power
supply voltage are all correct.
Sufficiently tighten the installation screws and terminal
screws.
Set the mode switch to PROG. mode.
Summary of Contents for FP0 Series
Page 14: ...Table of Contents FP0 xii ...
Page 16: ...Overview FP0 1 2 ...
Page 82: ...S LINK Control Unit FP0 4 2 ...
Page 95: ...Chapter 5 I O Allocation 5 1 I O Number 5 3 5 2 Control Unit 5 4 5 3 Expansion I O Unit 5 5 ...
Page 96: ...I O Allocation FP0 5 2 ...
Page 100: ...I O Allocation FP0 5 6 5 3 Expansion I O Unit ...
Page 102: ...Installation FP0 6 2 ...
Page 112: ...Installation FP0 6 12 6 5 Installation Using FP0 Flat Type Mounting Plate ...
Page 114: ...Wiring FP0 7 2 ...
Page 198: ...High speed Counter Pulse Output PWM Output FP0 9 34 9 5 PWM Output Function ...
Page 200: ...General use Serial Communications FP0 10 2 ...
Page 210: ...Self Diagnostic and Troubleshooting FP0 11 2 ...
Page 220: ...Specifications FP0 12 2 ...
Page 234: ...Dimensions FP0 13 2 ...
Page 243: ...Chapter 14 Appendix ...
Page 380: ...14 138 14 7 ASCII Codes ...