
2
Installa
tion
2-27
14
Place the cover on the base side.
Placing the cover
Step 14
Place the cover so that
it is not damaged
15
Reattach the cover in the reverse
order of detachment.
It is recommended to replace the O-rings and seals
with new ones. If these parts are not replaced or
reattached, the dust/drip proof performance or the
degree of cleanliness may lower.
For details about the bellows clamp position, see the
Fig. on the right.
3
12
1.5
Clamp
Step 15
The bellows end face is flush
with the clamp ring end face
Clamp ring
Clamp ring
Rubber
Rubber
Bellows end face
* Install the bellows and clamp at the positions
shown in the Fig. above
(Tolerance: ±0.5 mm)
Almost this orientation
Rubber
Reattach the clamp
so that the projection
part of the clamp shown
in the Photo is located
in the clearance of the
black rubber.
Summary of Contents for R6YXGLC250
Page 1: ...ZX T Series Cat No I158E EN 02A R6Y XGC XGP series INSTALLATION MANUAL SCARA Robots XG Series...
Page 2: ......
Page 8: ......
Page 34: ......
Page 36: ......
Page 38: ......
Page 42: ......
Page 44: ......
Page 50: ......
Page 86: ......
Page 91: ...Chapter 4 Periodic inspection Contents 1 List of inspection items 4 1...
Page 92: ......
Page 95: ...Chapter 5 Harmonic drive replacement period Contents 1 Overview 5 1 2 Replacement period 5 2...
Page 96: ......
Page 100: ......
Page 104: ......
Page 106: ......
Page 135: ......