
2
Installa
tion
2-10
4
Secure the robot main body firmly.
Secure the robot main body firmly with the four hex socket head bolts as shown in the Fig. below.
WARNING
WHEN INSTALLING THE ROBOT, BE SURE TO USE THE SPECIFIED SIZE AND QUANTITY OF BOLTS THAT MATCH THE
DEPTH OF TAPPED HOLES IN THE INSTALLATION BASE, AND SECURELY TIGHTEN THE BOLTS TO THE CORRECT
TORQUE. IF THE BOLTS ARE NOT TIGHTENED CORRECTLY, THE ROBOT MIGHT FALL OVER DURING OPERATION
CAUSING A SERIOUS ACCIDENT.
Tightening torque
Robot Model
Bolts Used
Tightening torque
R6YXGLC(P)250, R6YXGLC(P)350, R6YXGLC(P)400, R6YXGLC(P)500,
R6YXGLC(P)600
M8
37Nm (380kgfcm)
Depth of tapped holes in installation base:
Iron installation base
: Bolt diameter × 1.5 or more
Aluminum installation base
: Bolt diameter × 3.0 or more
Recommended bolt
: JIS B 1176 hex socket head bolt, or equivalent
Strength class JIS B 1051 12.9, or equivalent
Installing the robot
Installation base
Hex socket head bolt
2.2.2 R6YXGP500, R6YXGP600, R6YXGHP600, R6YXGP700, R6YXGP800, R6YXGP900,
R6YXGP1000
For details regarding the transport (moving) and installation of the R6YXGP500, R6YXGP600, R6YXGHP600,
R6YXGP700, R6YXGP800, R6YXGP900, R6YXGP1000 models, refer to the standard specification XG Installation
Manual, Chapter 2 "2. Installation".
Summary of Contents for R6YXGLC250
Page 1: ...ZX T Series Cat No I158E EN 02A R6Y XGC XGP series INSTALLATION MANUAL SCARA Robots XG Series...
Page 2: ......
Page 8: ......
Page 34: ......
Page 36: ......
Page 38: ......
Page 42: ......
Page 44: ......
Page 50: ......
Page 86: ......
Page 91: ...Chapter 4 Periodic inspection Contents 1 List of inspection items 4 1...
Page 92: ......
Page 95: ...Chapter 5 Harmonic drive replacement period Contents 1 Overview 5 1 2 Replacement period 5 2...
Page 96: ......
Page 100: ......
Page 104: ......
Page 106: ......
Page 135: ......