107
PLC Network Instructions
Section 6-2
Max. transmission delay = Link servicing interval (source node) + Transmis-
sion processing (command) + Communications cycle + Transmission delay
(command) + Reception processing (command) + Link servicing interval (des-
tination node) + LINK service processing (destination node) + Transmission
processing (response) + Communications cycle + (transmission delay
(response) + Reception processing (response) + Link servicing interval
(source node) + LINK service processing (source node).
Link Servicing Interval (Source and Destination Nodes)
Links are serviced once per PLC execution cycle. Refer to the
CS-series PLC
Operation Manual
for details.
Link Service Processing (Source and Destination Nodes)
Link service processing is the same as the PLC’s peripheral servicing and is
approximately 1 ms for SYSMAC LINK Units.
Transmission and Reception Processing
Commands: 2 ms
Responses: Number of words transferred x 0.0045 ms + 4 ms
Communications Cycle Time
Coaxial:
Max. node address
×
0.01 ms + No. of nodes
×
0.075 ms + No.
of polled units
×
0.75 ms + 1.322 ms
Optical: Max. node address
×
0.01 ms + No. of nodes
×
0.133 ms + No. of
polled units
×
0.75 ms + 1.322 ms
Transmission Delay
Commands: 0.204 ms
Responses: Number of words transferred x 0.008 ms + 0.204 ms
Note
The I/O response time can increase due to noise or restrictions on the number
of frames that can be transmitted while the data link is operating.
Example
In this example, the maximum transmission delay is calculated for an instruc-
tion receiving 256 words of data in a system with 32 nodes. Network specifics
are detailed below:
Max. node address:
32
Number of nodes:
32
Number of polled units: 4
Number of words:
256
Communications:
coaxial cable
Data link:
halted
Delay cause
Maximum delay (ms)
LINK Unit servicing (source node)
PLC cycle time
LINK service processing (source node)
1 ms
Transmission processing (command)
2 ms
Communications cycle
32
×
0.01 + 32
×
0.075 + 4
×
0.75 +
1.322 = 7.042 ms
Transmission delay (command)
0.204 ms
Reception processing (command)
2 ms
Link servicing interval (destination node)
CPU Unit cycle time
Link service processing (destination node)
1 ms
Transmission processing (response)
256
×
0.0045 + 4 = 5.152 ms
Transmission delay (response)
256
×
0.008 + 0.204 = 2.252 ms
Summary of Contents for CS1W-SLK11-21 - 06-2004
Page 1: ...Cat No W367 E1 02 SYSMAC CS1W SLK11 21 SYSMAC LINK Units...
Page 2: ...CS1W SLK11 21 SYSMAC LINK Units Operation Manual Revised June 2004...
Page 3: ...iv...
Page 5: ...vi...
Page 9: ......
Page 11: ......
Page 17: ......
Page 49: ......
Page 107: ......
Page 139: ...122 FINS Commands for SYSMAC LINK Units Section 6 4...
Page 143: ......
Page 170: ...153 Appendix B Dimensions CS1W SLK11 Optical SYSMAC LINK Unit Unit mm...
Page 171: ...154 Dimensions Appendix B CS1W SLK21 Coaxial SYSMAC LINK Unit Unit mm...
Page 177: ......
Page 179: ......
Page 195: ......
Page 199: ......
Page 202: ...SYSMAC CS1W SLK11 21 SYSMAC LINK Units Cat No W367 E1 02 OPERATION MANUAL...