Group 5
Transport/start up
Page 39
Release 3.00
Leibinger-Jet 2 se
5.4 Start up
(Putting into service)
5.4.1 Initial start up in an empty condition
Dangerous electrical voltage!
Contact causes serious damage through an electric shock!
Disconnect the device from the mains supply prior to opening.
Remove mains plug!
Risk of injury!
Spraying of ink into the eyes can cause blindness. Prior to the
opening of the device eye protection must be put on!
This work must only be carried out by trained personnel or by
Leibinger service technicians!
Check device for dirt! More detailed information on the components described below can
be found in the group
Operation
in the chapters
Structure and description of the
device
.
Print head
Remove the head cover. Check the deflector unit as well as the charging electrode for
dirt or transport dust and if necessary blow out with compressed air. Switch on ink switch
(ink on – switch upwards).
Refilling unit
The storage containers were emptied before dispatch so as to prevent the flowing out of
ink and solvent and as a result damage during transport. Consequently the device must
be filled before the initial start up. Details of the filling process can be found in the group
Equipping/maintenance
in the chapter
Refilling of ink and solvent
!
Recreate mains connection and switch on the LEIBINGER-JET 2 with the LCD touch
display. Details on the switching on procedure can be found in the group
Operation
in
the chapter
Operating procedures and operating elements
! Following switching on
the device is bleed automatically i.e. the ink is automatically pumped from the storage
container into the pressure tank. This procedure can last up to 5 minutes.