Group 5
Transport/start up
Page 40
Release 3.00
Leibinger-Jet 2 se
The operating pressure must rise to the value set in the menu level
<E43>
(“Main menu
!
service/test/system parameter
!
/service/test & diagnostics
!
hydraulic test &
parameter
!
service menu“). The operating pressures are approx. 3 bar/70µm jet or
approx. 4 bar/40 mm jet. The pressure achieved can be read in the menu level
<E29>
(“Main menu
!
service/test/system parameter
!
service/test & diagnostics
!
hydraulic test & parameter“).
Should the operating pressure not be built up after approx. 30 seconds, if necessary the
function of the main pump and of the compressor must be checked!
In the display the pressure is shown in mbar i.e. a display value of
3000 stands for 3 bar.
An error notification that may possibly be displayed
“Ink tank is low level please refill ink!”
must be confirmed by tapping on the status field or ink refilled. The filling procedure has
been concluded when no refill error appears.
Place on the head cover of the print head and press the status field
<nozzle closed>
.
The jet opens and the status display changes.
If the notification “Print Yes” appears in the status field
<print>
the LEIBINGER-JET 2 is
ready for operation. The data can now be entered as described in the group
Operation
in the chapter
Operating procedures and operating elements
as well as in the group
Data entry
.
[E29]
Display of the achieved
pressure