Group 9
Equipping/maintenance
Page 150
Release 3.00
Leibinger-Jet 2 se
Manner of proceeding:
!
Place the LEIBINGER-JET 2 into the operating mode “Nozzle closed” (1) and “Ink
switch on” (2).
!
Deactivate the regulation (3) in the menu level
<E29>
(main menu
!
service/test/system parameter
!
service/test & diagnostics
!
hydraulic test &
parameter).
!
Press the button “pressureless” (4) in the menu level
<E29>
and wait for a while until
the values for the
“membrane”
and
“pressure”
(5) moving towards ~“0“.
!
The LEIBINGER- JET 2 is now without pressure and
must
be disconnected from the
mains supply.
Remove mains plug!
!
Detach tube connections and connection cable and dismantle suction pump.
!
Rinse out suction pump with solvent.
!
Assemble pump again, create tube connections and electrical connection.
!
As with the initial commissioning the further steps are performed in the empty
condition. Further information can be found in the chapter
Start up
!
!
If the measure is not successful, the working membrane may be damaged and the
suction pump must be replaced.
4
5
1
2
3