Group 5
Transport/start up
Page 41
Release 3.00
Leibinger-Jet 2 se
5.4.2 Initial start up in a full condition
Dangerous electrical voltage!
Contact causes serious damage through an electric shock!
Disconnect the device from the mains supply prior to opening.
Remove mains plug!
Risk of injury!
Spraying of ink into the eyes can cause blindness. Prior to the
opening of the device eye protection must be put on!
This work must only be carried out by trained personnel or by
Leibinger service technicians!
Check device for dirt! More detailed information on the components described below can
be found in the group
Operation
in the chapters
Structure and description of the
device
.
Print head
Remove the head cover. Check the deflector unit as well as the charging electrode for
dirt or transport dust and if necessary blow out with compressed air. Switch on ink switch
(ink on – switch upwards).
Recreate mains connection and switch on the LEIBINGER-JET 2 with the LCD touch
display. Details on the switching on procedure can be found in the group
Operation
in
the chapter
Operating procedures and operating elements
! Following switching on
the device is bleed automatically i.e. the ink is automatically pumped from the storage
container into the pressure tank. This procedure can last up to 5 minutes. The operating
pressure must rise to the value set in the menu level
<E43>
(“Main menu
!
service/test/
system parameter
!
service/test & diagnostics
!
hydraulic test & parameter
!
service
menu“). The operating pressures are approx. 3 bar/70µm jet or approx. 4 bar/40 mm jet.
The pressure achieved can be read in the menu level
<E29>
(“Main menu
!
service/test/
system parameter
!
service/test & diagnostics
!
hydraulic test & parameter“).
Should the operating pressure not be built up after approx. 30 seconds, if necessary the
function of the main pump and of the compressor must be checked!