SDA Operator’s Manual
The required Excel formula required is shown as follows:
In fact, the simple expression B374 + 0.02 comprise several components. The original instrument
trace is in column B, and the plot is required to start at cell B134. The traces repeat at intervals of
250 cells. Let us call this interval R. If we require a horizontal displacement D, then in cell CN we
write B(N + R – D). In this example D is 10. Finally we may want a vertical displacement V, and
we write B(N + R – D) + V. In this example, V is 0.02. D and V can be zero if required, as
depicted below. All that remains is to copy the formula to the required range of cells.
SDA-OM-E Rev H
245
Summary of Contents for SDA
Page 1: ...SERIAL DATA ANALYZER OPERATOR S MANUAL December 2007 ...
Page 223: ...SDA Operator s Manual Example 6 SDA OM E Rev H 223 ...
Page 225: ...SDA Operator s Manual SDA OM E Rev H 225 ...
Page 246: ...246 SDA OM E Rev H ...
Page 247: ...SDA Operator s Manual Excel Example 5 Using a Surface Plot SDA OM E Rev H 247 ...
Page 279: ...SDA Operator s Manual Convolving two signals SDA OM E Rev H 279 ...
Page 310: ...The jitter wizard is accessed from the Analysis drop down menu 310 SDA OM E Rev H ...
Page 327: ...SDA Operator s Manual SDA OM E Rev H 327 ...
Page 328: ...328 SDA OM E Rev H ...
Page 394: ...394 SDA OM E Rev H ...