![Krone Comprima F 125 XC-1 Operating Instructions Manual Download Page 84](http://html1.mh-extra.com/html/krone/comprima-f-125-xc-1/comprima-f-125-xc-1_operating-instructions-manual_2004803084.webp)
Commissioning
84
Pos: 37.52 /Überschriften/Zwischenüberschriften/A-E/Bei Ausführung Zugöse unten @ 364\mod_1440602815428_78.docx @ 2681595 @ @ 1
For drawbar bottom version
Pos: 37.53 /BA/Erstinbetriebnahme/Rundballenpresse/Gelenkwelle/Zugöse drehen_bei Ausführung Zugöse für Untenanhängung @ 361\mod_1439388142667_78.docx @ 2667275 @ @ 1
COM00321
1
2
3
4
4
3
Fig. 54
In order to get more universal shaft clearance, the drawbar eye can be mounted in position (1)
or (2) on the drawbar (3).
•
Loosen screw connection (4) using suitable tool.
•
Turn drawbar eye in the desired position and mount with screw connection (4) on the
drawbar (3).
Pos: 37.54 /BA/Erstinbetriebnahme/Rundballenpresse/Gelenkwelle/Bild Gelenkwelle ablegen @ 32\mod_1253534197361_78.docx @ 314306 @ @ 1
RBV02240
2
1
Fig. 55
Pos: 37.55 /BA/Erstinbetriebnahme/Rundballenpresse/Gelenkwelle/Gelenkwelle ablegen @ 32\mod_1253534329111_78.docx @ 314331 @ @ 1
•
Place the PTO shaft (1) inside the PTO shaft support (2).
Pos: 37.56 /Layout Module /---------------Seitenumbruch---------------- @ 0\mod_1196175311226_0.docx @ 4165 @ @ 1