![Krone Comprima F 125 XC-1 Operating Instructions Manual Download Page 83](http://html1.mh-extra.com/html/krone/comprima-f-125-xc-1/comprima-f-125-xc-1_operating-instructions-manual_2004803083.webp)
Commissioning
83
Pos: 37.47 /BA/Erstinbetriebnahme/Rundballenpresse/Gelenkwelle/Bild Anbau Gelenkwellenhalter @ 32\mod_1253533150220_78.docx @ 314206 @ @ 1
RP-99-012
2
1
Fig. 52
Pos: 37.48 /BA/Erstinbetriebnahme/Rundballenpresse/Gelenkwelle/Anbau Gelenkwellenhalter @ 32\mod_1253533341376_78.docx @ 314231 @ @ 1
•
Switch off the engine and remove the ignition key.
•
Assemble the PTO shaft bracket (1) and secure the PTO shaft support (2).
Pos: 37.49 /BA/Erstinbetriebnahme/Rundballenpresse/Gelenkwelle/Bild Anbau Gelenkwelle @ 32\mod_1253534105814_78.docx @ 314281 @ @ 1
KR-1-080
2
1
Fig. 53
Pos: 37.50 /BA/Erstinbetriebnahme/Rundballenpresse/Gelenkwelle/Anbau Gelenkwelle @ 32\mod_1253533634439_78.docx @ 314256 @ @ 1
•
Push on the PTO shaft (1) with overload protection on the machine side until the protection
mechanism locks into place or the PTO shaft can be screwed together (see PTO shaft
manufacturer’s operating instructions).
•
Secure the PTO shaft guard retaining chains (2) on the machine side.
Pos: 37.51 /Layout Module /---------------Seitenumbruch---------------- @ 0\mod_1196175311226_0.docx @ 4165 @ @ 1