![Krone Comprima F 125 XC-1 Operating Instructions Manual Download Page 372](http://html1.mh-extra.com/html/krone/comprima-f-125-xc-1/comprima-f-125-xc-1_operating-instructions-manual_2004803372.webp)
253
Pick-up drive belt tension ................................. 204
Placing in Storage ............................................. 238
Position and meaning of the safety stickers on the
machine .......................................................... 29
Position of the Sensors ..................................... 179
Preparations for road travel .............................. 101
Preparing the machine for transportation ......... 105
securing the twine box flap ........................... 106
Preparing the wrapping material brake ............... 87
Prior to working on the hydraulic system .......... 228
PTO shaft ............................................................ 81
Purpose of Use ................................................... 13
Putting Wheel Chocks Underneath .................. 103
R
Reduce the Pressure on the Side Walls of the
Bale Chamber ............................................... 111
Releasing the wrapping material brake ............ 167
Removing insulating tape from the brake disc . 241
Remowing the Crop Blockages in the Crop
Collection Area ............................................. 157
Re-Ordering Safety Labels and Information Labels
........................................................................ 46
Re-Ordering this Document .................................. 8
Replacing the hydraulic oil filter ........................ 230
Reversing .......................................................... 161
Roller drive - drive belt tension ......................... 207
S
Safely checking the oil level and changing the oil
and filter element ............................................ 28
Safety .................................................................. 13
Safety routines .................................................... 27
Safety signs on the machine .............................. 21
Safety stickers on the machine ........................... 29
Scope of Document .............................................. 9
Securing the side hoods ................................... 106
Securing the twine box flap .............................. 106
Sensors
setting ............................................................ 183
Service life of the machine ................................. 13
Set Baling Pressure .......................................... 129
Setting Axial Play of Net Brake ......................... 183
Setting Bale Diameter ....................................... 128
Setting Brake Linkage....................................... 191
Setting Retaining Comb for Film Tying ............. 146
Setting Scraper to Spiral Roller ........................ 174
Setting Tailgate Lock ........................................ 178
Setting the crop press roller unit ...................... 122
Setting the density of the bale core ................. 153
Setting the double rocker arm .......................... 154
Setting the Number of Net Layers ................... 135
Setting the stone deflector ............................... 177
Setting the wrapping material brake ................ 163
Settings ............................................................ 163
Settings of the Brakes with Manual Linkage Setter
..................................................................... 189
Shut-off valve for tailgate ........................... 54, 228
Solenoid valves ................................................ 229
Sources of danger on the machine .................... 24
Spare Parts ...................................................... 172
Start-up .............................................................. 88
Stop Points ......................................................... 53
Stopping and securing the machine .................. 27
Structural changes to the machine .................... 15
Supporting lifted machine and machine parts
securely .......................................................... 27
Switching off the machine ................................ 103
T
Target group of this document ............................. 8
Technical data .................................................... 57
Technical Data of the Machine .......................... 57
Tensioning the floor conveyor .......................... 117
Term ..................................................................... 9
Tighten the floor conveyor and set the spring
pretensioning ............................................... 150
Tightening torques ........................................... 185
Tightening Torques for Locking Screws and Bleed
Valves on the Gearboxes ............................ 187
Time Intervals for Oil Level Check and Oil Change
on the Gearboxes ........................................ 197
Traffic safety ...................................................... 21
Travelling speed ............................................... 109
Tyre pressure ..................................................... 87
Tyres ................................................................ 193
U
Using the safety chain ....................................... 98
W
Wheel chocks ..................................................... 52
Workstations on the Machine ............................ 15
Wrapping and Depositing Bales ...................... 115
Wrapping material brake
Increasing or reducing the brake force ........ 164
Setting net or chamber film wrapping........... 164