![Krone Comprima F 125 XC-1 Operating Instructions Manual Download Page 115](http://html1.mh-extra.com/html/krone/comprima-f-125-xc-1/comprima-f-125-xc-1_operating-instructions-manual_2004803115.webp)
Operation
115
Pos: 43.43 /Abkürzungen /Abkürzungen sprachneutral/Rundballenpressen/Comprima V 210 XC - 1 @ 500\mod_1493208360400_0.docx @ 3436639 @ @ 1
Comprima V 210 XC - 1
Pos: 43.44 /BA/Bedienung /Rundballenpresse/AnlageblecheBild Anlagebleche montieren CV150-210 @ 137\mod_1353510846547_78.docx @ 1219153 @ @ 1
1
HDC00062
2
HDC00063
3
Fig. 83
Pos: 43.45 /BA/Bedienung /Rundballenpresse/AnlageblecheText Anlagebleche montieren alle Maschinen @ 137\mod_1353912825978_78.docx @ 1222840 @ @ 1
If the completed bales do not fall out of the front bale chamber, two ejector plates (1) can be
assembled right and left in the tailgate of the machine.
•
Install the ejector plates (1) with the screws (2) on the insides of the bale chamber into the
existing bore holes.
•
If the completed bales do even not fall out of the front bale chamber after having installed
the ejector plates (1), remove the sliding plates (3) from the machine housing right and left.
The ejector plates (1) can be ordered with suitable screws from KRONE spare part storage by
stating the following spare parts no.:
Pos: 43.46 /BA/Bedienung /Rundballenpresse/AnlageblecheTabelle Ersatzteile Anlagebleche CV210 @ 137\mod_1353510973257_78.docx @ 1219422 @ @ 1
Units
Spare part
Spare parts no.
2
Ejector plates
200679180
6
Countersunk screw with hexagonal
socket
9040453
Pos: 43.47 /BA/Bedienung /Rundballenpresse/Ballen bindenBallen binden @ 35\mod_1256126963097_78.docx @ 326486 @ 2 @ 1
9.4
Wrapping and Depositing Bales
•
Start the tying and/or wrapping process (refer to chapter Operation). Continue receiving
crop until the tying or wrapping material from the crop is being moved into the bale chamber
and caught by the round bale. The nominal speed of 540 rpm must be maintained until the
tying process is complete.
•
Stop the tractor and wait until the twine or net wrapping process is complete.
•
Eject round bales by opening the bale chamber. Always open the tailgate completely, since
the cylinders must be completely extended to build up pressure for the floor conveyor
clamping.
•
Always close the bale chamber at idle speed only and start the next baling process.
Pos: 43.48 /Layout Module /---------------Seitenumbruch---------------- @ 0\mod_1196175311226_0.docx @ 4165 @ @ 1