Korenix Technology Co., Ltd.
Industrial
Layer 3 Managed Ethernet Switch
_____________________________________________________________________________
Industrial Layer 3 Managed Ethernet SwitchUser Manual
Page: 899/1246
-
Option 'Days of week' enables selection of applicable periodic entry start day and end day
from 'Start Day' and 'End Day' fields of the page.
Start Day
- Select the day(s) of the week of the periodic entry's start day. Multiple days can be
selected. On selecting multiple days for the 'Start Day' field, the 'End Day' field takes the same input.
Hence selecting multiple days for the start day does not require any input for the end day.
Start Time
- Specify the periodic start time in hh:mm format.
End Day
- Select the day of the week of the periodic entry's end day.
End Time
- Specify the periodic end time in hh:mm format.
Command Buttons
Submit
- Update the switch with the values on the screen. If you want the switch to retain the new
values across a power cycle you must perform a save.
Delete
- Removes the currently selected entry from the selected time range.