1. Check and confirm all the items in the check list before first start-up of the machine.
When power is applied to the machine the controller boots and carries out a self test.
The display and the
Controller on LED illuminate.
6 . 1 b a r
0 8 : 1 5 A M
8 0 ° C
Header
------------------------------
Load
Current operating mode
------------------------------
Key
– on ¦
pA
– on
Operating parameters
------------------------------
Run
2500h
Load
2490h
Operating parameters
Maintenance in
500h
Maintenance indicator
2. Continue the commissioning process as described in chapter "Commissioning" of the ma‐
chine's operating manual.
8
Initial Start-up
8.16 Commissioning the machine
No.: 9_9450 12 E
User Manual Controller
SIGMA CONTROL 2 SCREW FLUID ≥5.0.X