Chapter 7
DS0 VF Test Commands
Description of VF test commands
CT-650 Command-Line Reference Guide
Release 9.4
77
Remarks
– This command is available only after executing a
DI_Monitor
command.
– This command establishes an AB split across the DS1 signal with
the selected DS0 channel configured in an EF split.
– The parameters
signaling_bits_selected
and
signaling_bits_connected
are available for split modes
other than transparent.
VF_Measure
Executes an intrusive test on the chosen side of the circuit being
tested.
Syntax
VF_Measure <
> <
>
<
>
Remarks
– For a list of available vf_test_types, see
– To perform an end-to-end test, execute the
VF_Measure
command to transmit a test signal from the unit and transmit the
same test signal from the far end.
VF_Split
Establishes an intrusive connection between the monitored digroup
and DS0 channel and a DTU RTU. After executing the command, the
unit sends the correct split command to the DCS.
Syntax
VF_Split <
<
>
Remarks
– This command is available only after executing a
Monitor
command.
– This command establishes an EF split across the DS1 signal.
– The parameters
signaling_bits_selected
and
signaling_bits_connected
are available for split modes
other than transparent.
Summary of Contents for CT-650
Page 1: ...CT 650 Wideband Test Unit Release 9 4 Command Line Reference Guide ...
Page 2: ......
Page 3: ...CT 650 Wideband Test Unit Release 9 4 Command Line Reference Guide ...
Page 4: ......
Page 22: ...Contents xxii CT 650 Command Line Reference Guide Release 9 4 ...
Page 240: ...Appendix D Customer Services and Support Training options 214 CT 650 User s Guide Release 9 3 ...
Page 247: ......