.030
101
Figure 137: Check impeller run out
For more information on how to set the impeller clearances, refer to the Impeller-clearance checks and
Impeller-clearance setting sections in Commissioning, Startup, Operation, and Shutdown.
6.6.13 Attach the i-ALERT
®
2 Equipment Health Monitor to the pump
Tools required:
•
5/32 inch hex wrench
1.
Attach the condition monitor (761B) to the bearing frame (228A) using the hex-head screw (372T)
provided.
372T
228A
761B
Figure 138: Attaching the condition monitor to bearing the frame
2.
Tighten the hex-head screw to 8 Nm | 6 ft-lbs.
More detailed information is available on:
http://www.ittproservices.com/aftermarket-products/monitoring/i-alert2/i-ALERT2.com
6.6 Reassembly
144
Model CV 3196 i-FRAME Installation, Operation, and Maintenance Manual