D10
Service
Position
To
perform
a
removal
or
replacement
procedure
that
requires
access
to
the
inside
of
the
I/O
subsystem,
the
subsystem
must
be
removed
from
the
rack
and
placed
on
a
stable
work
surface.
To
put
the
drawer
into
the
service
position,
do
the
following:
1.
Shut
down
the
system
unit
to
which
the
I/O
subsystem
is
connected.
2.
From
the
rear
of
the
rack,
disconnect
the
I/O
subsystem’s
power
cables
from
the
power
distribution
bus.
3.
Remove
the
retaining
screws
located
on
the
rear
of
the
I/O
subsystem
drawer.
4.
Label
and
disconnect
all
of
the
cables
connected
to
the
rear
of
the
I/O
subsystem.
5.
From
the
rear
of
the
rack,
pull
the
I/O
subsystem
straight
back
until
the
subsystem
stops.
6.
To
allow
the
subsystem
to
move
further
to
the
rear,
press
the
stop
latch
on
the
side
of
the
enclosure.
7.
Support
the
I/O
subsystem
as
you
pull
it
toward
the
rear
of
the
rack.
8.
When
the
I/O
subsystem
is
out
of
the
rack,
place
it
on
a
stable
work
surface.
D10
Operating
Position
To
return
the
subsystem
to
the
operating
position,
do
the
following:
1.
From
the
rear
of
the
rack,
insert
the
I/O
subsystem
into
the
position
from
which
it
was
removed.
The
end
of
the
I/O
subsystem
that
has
the
power
supplies
goes
toward
the
front
of
the
rack.
2.
Support
the
I/O
subsystem
as
you
push
it
toward
the
front
of
the
rack.
3.
Install
the
retaining
screws
in
the
rear
of
the
I/O
subsystem
drawer.
4.
Reconnect
the
cables
to
the
rear
of
the
I/O
subsystem.
5.
Reconnect
the
power
cables.
6.
Restart
the
system.
D10
Front
Bezel
Before
performing
the
following
procedure,
read
the
“Safety
Notices”
on
page
vii.
Removal
To
remove
the
front
bezel,
do
the
following:
1.
Open
the
front
rack
door.
2.
Simultaneously
press
in
both
bezel-release
tabs.
3.
Pivoting
the
bezel
from
the
top,
swing
the
top
forward.
4.
Pull
the
bottom
of
the
bezel
up,
then
away
from
the
subsystem
chassis.
This
action
releases
the
two
tab
hooks
located
on
the
bottom
of
the
I/O
subsystem
chassis.
Front
Bezel
Replacement
To
replace
the
front
bezel,
do
the
following:
1.
Open
the
front
rack
door.
2.
Insert
the
two
tabs
located
on
the
bottom
edge
of
the
bezel
into
their
locking
hooks,
located
on
the
chassis.
3.
Pivot
the
front
bezel
up
toward
the
top
of
the
chassis.
4.
Align
the
release
tabs
to
the
matching
slots
located
on
the
front
of
the
subsystem
chassis.
5.
Gently
push
the
tabs
into
the
slots
until
the
bezel
seats
against
the
front
of
the
subsystem.
6.
If
the
subsystem
is
not
completely
in
the
operating
position,
push
the
subsystem
back
into
the
operating
position
as
described
in
“D10
Operating
Position.”
7.
Close
the
rack
door.
Chapter
3.
Removal
and
Replacement
Procedures
43
Summary of Contents for eserver pSeries 7311 D10
Page 1: ...pSeries 7311 Model D10 and Model D20 Service Guide SA38 0627 01 ERserver...
Page 2: ......
Page 3: ...pSeries 7311 Model D10 and Model D20 Service Guide SA38 0627 01 ERserver...
Page 8: ...vi Eserver pSeries 7311 Model D10 and Model D20 Service Guide...
Page 12: ...x Eserver pSeries 7311 Model D10 and Model D20 Service Guide...
Page 14: ...xii Eserver pSeries 7311 Model D10 and Model D20 Service Guide...
Page 25: ...1 Processor Subsystem 2 I O Subsystem Chapter 1 Reference Information 9...
Page 89: ...Chapter 3 Removal and Replacement Procedures 73...
Page 99: ...2 1 1 Top of Cassette 2 Handle Chapter 3 Removal and Replacement Procedures 83...
Page 179: ...D10 I O Subsystem Parts continued 1 2 3 4 5 6 7 Chapter 4 Parts Information 163...
Page 207: ......