3.5.1.4 (Optional) Installing a Vertical Ground Bar......................................................................................................... 41
3.5.2 (Optional) Installing an Enclosure Frame for the PDF.........................................................................................42
3.6 Grounding a Cabinet............................................................................................................................................................44
3.7 Installing Aisle Components..............................................................................................................................................44
3.7.1 Installing an Aisle Door................................................................................................................................................... 44
3.7.2 Combining Aisle Doors.................................................................................................................................................... 50
3.8 Installing Cable Troughs and Cable Racks................................................................................................................... 50
3.8.1 Installing Cable Troughs..................................................................................................................................................50
3.8.2 Installing an End Panel for a Cable Trough..............................................................................................................55
3.9 Installing Power Supply and Distribution Devices.....................................................................................................56
3.9.1 Installing a PDU2000....................................................................................................................................................... 56
3.9.2 (Optional) Installing a Power Distribution Box for Smart Cooling Products................................................56
3.9.3 (Optional) Installing an NMW......................................................................................................................................58
3.9.3.1 Layout and Cable Routing Principles: Single-Row Aisle Containment (2N Scenario)............................58
3.9.3.2 Layout and Cable Routing Principles: Single-Row Aisle Containment (N+1 Scenario).........................59
3.9.3.3 Installing an NMW........................................................................................................................................................ 60
3.10 Installing Monitoring Devices.........................................................................................................................................66
3.10.1 Installing a Smart ETH Gateway................................................................................................................................66
3.10.2 Installing an Electronic Clasp Lock............................................................................................................................67
3.10.3 Installing a PAD............................................................................................................................................................... 70
3.10.4 Securing the PAD Mounting Kit................................................................................................................................. 71
3.10.5 Installing an ECC800-Pro.............................................................................................................................................. 72
3.10.6 Installing a LAN Switch................................................................................................................................................. 75
3.10.7 Installing an IVS1800..................................................................................................................................................... 76
3.10.8 (Optional) Installing a TaiShan 200 Server............................................................................................................80
3.10.9 Installing a 2288X V5 Server....................................................................................................................................... 82
3.10.10 Installing a Camera...................................................................................................................................................... 84
3.10.11 Rules for Deploying T/H Sensors.............................................................................................................................88
3.10.12 Installing T/H Sensors (02312PBL).........................................................................................................................89
3.10.13 (Optional) Installing T/H Sensors (33010516)...................................................................................................92
3.10.14 Installing a Smoke Detector..................................................................................................................................... 96
3.10.15 Routing a Cable to a WLDS900 Water Sensor................................................................................................... 96
4.1 System Cabling Rules........................................................................................................................................................ 103
4.2 Installing New Main Way Cables.................................................................................................................................. 108
4.3 Connecting a Monitoring Cable to the Smart ETH Gateway.............................................................................. 113
4.4 Connecting Cabinet Electronic Clasp Lock Cables...................................................................................................114
4.5 Routing Power Cables for the PAD and WiFi Module........................................................................................... 115
4.6 Connecting IVS1800 Cables............................................................................................................................................ 116
4.7 (Optional) Connecting rPDU Cables............................................................................................................................116
4.8 (Optional) Cabling Routes for a Smart Cooling Product PDB............................................................................ 117
FusionModule2000-S Smart Modular Data Center
User Manual
Contents
Issue 03 (2021-07-15)
Copyright © Huawei Technologies Co., Ltd.
v