Figure 4-12 Installing load cables
(1) Ring buckle
(2) Spring buckle
(3) Red line
Step 6 Install cascading cables.
NO TICE
If a 48 V cascading cable needs to be prepared onsite, ensure that the wire with a
red tube is inserted into the terminal pin marked in red and the wire with a black
tube is inserted into the terminal pin marked in blue.
FusionModule2000-S Smart Modular Data Center
User Manual
4 System Cabling
Issue 03 (2021-07-15)
Copyright © Huawei Technologies Co., Ltd.
111