Figure 3-19 Installing floating nuts
Step 2 (Optional) Remove side panels based on the labels on the side panels to be
adjusted.
Step 3 Secure the side panels to the outside of the IT cabinet at the end of the row.
NO TE
Install two side panels for each end cabinet, one in the upper part and the other in the lower
part.
Figure 3-20 Installing a cabinet side panel
Step 4 (Optional) After adjusting side panels, remove the labels on the panels.
----End
FusionModule2000-S Smart Modular Data Center
User Manual
3 Hardware Installation
Issue 03 (2021-07-15)
Copyright © Huawei Technologies Co., Ltd.
39